Posted: May 5, 2015 | Written by Tyler Reese
Construction vehicles guided by flagmen entered and left the Riverside City College construction site for the new Student Services building on May 5, via Ramona drive.
Cement trucks will enter and leave the college using Ramona drive while guided by flagmen to and from the construction site, starting from 7 a.m. until 2 p.m. on May 15.
The sand and gravel will be placed by the use of a tele-belt system. Noise is expected which may affect the south-side of the Math and Science buildings.