Delays, doubts raised on Quad construction

Problems with infrastructure and unexpected changes in design have pushed back the reopening of the A.G. Paul Quadrangle at Riverside City College. The preliminary date of July 7 has been pushed back to possibly October or November. According to Linda Lacy, Interim President of RCC, delays were attributed to the building’s infrastructure.

No More Posts