Posted: May 19, 2015 | Written by: Crystal Olmedo
The construction of the new Student Services and Administration Building is still underway.
There will be semi-trucks entering and leaving the construction site via the Ramona Drive construction entrance delivering structural steel May 18 – 22, according to RCC Business Services.
There is a possibility that trucks will need to be staged on Ramona Drive while the trucks within the construction fence are unloaded.
Traffic control and flagmen will be used to guide the trucks in and out of the site.
Questions may be directed to Janelle Wortman, Business Services at 951-222-8730.